Loading published research
Loading the last verified local snapshot. No live authority request is being made.
Independent research interface · Not a government website
Loading published research
Loading the last verified local snapshot. No live authority request is being made.
Independent research interface · Not a government website
California · HCAI official table
Search the official OSHPD Special Seismic Certification Preapproval table by exact OSP number, manufacturer, equipment subcategory, or source expiration value.
HCAI describes OSP as voluntary preapproval of special seismic certification for nonstructural components used in California healthcare facility construction. It is not a universal product approval or a project permit decision.
Verified official table rows
813 official record links · Checked Sep 1, 2026, 5:42 AM UTC
| OSP number | Manufacturer | Equipment subcategory | Official source value | Open |
|---|---|---|---|---|
| OSP-0601Expiration date stated | Daikin Applied | Chillers – Water Cooled | 1/12/2029 | Open |
| OSP-0602Expiration date stated | ABB | UPS | 10/21/2027 | Open |
| OSP-0603Expiration date stated | Danfoss | Variable Frequency Drives and Starters | 7/12/2028 | Open |
| OSP-0604Cancelled | Honeywell | Fire Alarm & Security Panels | Cancelled | Open |
| OSP-0605Expiration date stated | Beacon Medaes (Atlas Copco Compressors, LLC) | Medical Air and Vacuum Systems | 7/6/2032 | Open |
| OSP-0606Expiration date stated | Schneider Electric APC | UPS | 4/22/2028 | Open |
| OSP-0607Expired | Johnson Controls | Air Filters | Expired | Open |
| OSP-0608Expiration date stated | AMETEK Powervar | UPS | 3/2/2032 | Open |
| OSP-0609Expiration date stated | Cummins | Generators | 8/10/2028 | Open |
| OSP-0610Expiration date stated | Trane | Chillers – Water Cooled | 12/14/2027 | Open |
| OSP-0611Expiration date stated | Caterpillar (CAT) | Paralleling Switchgear Controls | 2/25/2032 | Open |
| OSP-0612Expiration date stated | Cummins | Generators | 10/24/2028 | Open |
| OSP-0613Expiration date stated | ABB Zenith Controls | Automatic Transfer Switches | 6/8/2032 | Open |
| OSP-0614Expiration date stated | Philips Medical Systems DMC GmbH | Fluoroscopy and Radiography Systems | 2/19/2031 | Open |
| OSP-0615Expired | Best Healthcare | Nurse Call Systems | Expired | Open |
| OSP-0616Expiration date stated | GE Healthcare | CT Systems | 4/23/2031 | Open |
| OSP-0617Expired | Advanced Mechanical Technologies | Building Automation and Security Systems | Expired | Open |
| OSP-0618Expiration date stated | Baltimore Aircoil Company, Inc. | Cooling Towers | 5/16/2031 | Open |
| OSP-0619Expiration date stated | Eaton | Motor Control Centers – Low Voltage | 2/26/2032 | Open |
| OSP-0620Cancelled | MTU | Generators | Cancelled | Open |
| OSP-0621Expiration date stated | Rolls-Royce Solutions America Inc. | Generators | 5/3/2028 | Open |
| OSP-0622Expired | Philips | CT Systems | Expired | Open |
| OSP-0623Expiration date stated | Cummins | Automatic Transfer Switches | 9/28/2027 | Open |
| OSP-0624Expiration date stated | Multistack | Chillers – Air Cooled | 4/18/2029 | Open |
| OSP-0625Expiration date stated | Siemens Industry, Inc. | Switchgear – Low Voltage | 2/26/2032 | Open |
| OSP-0626Expiration date stated | Intelligent Power Solutions | Automatic Transfer Switches | 5/1/2031 | Open |
| OSP-0627Expiration date stated | Price Industries Ltd. | Air Filters | 3/5/2032 | Open |
| OSP-0628Expiration date stated | GE Healthcare | CT Systems | 11/1/2030 | Open |
| OSP-0629Expired | Powervar | UPS | Expired | Open |
| OSP-0630Expiration date stated | Canon Medical Systems Corporation | CT Systems | 6/26/2030 | Open |
Approval Index stores normalized table metadata and the source-page hash, but does not store or serve HCAI documents. A stated future expiration date is not translated into active, current, or project-approved.
Open official HCAI OSP table